HausHerr HSB 3000 DRILLING RIG SUPPLY AND FINANCING
A three-year contract was signed with Elgen Drilling LLC to supply HausHerr brand HSB3000 drilling rigs.
In order to ensure the drilling rig's ability to operate continuously and with high quality, we have been stockpiling and supplying spare parts for 3 years.
Technical Data
Diameter /mm/ | 105-203 |
Drilling Depth /m/ | 45 |
Power Rating /kW/ | 292-354 |
PHEONIX CONVEYOR BELT SUPPLY PROJECT
Year of implementation: 2015-2019
Technical Data
Belt Supply /ton/ | 600 |
Splice Kit Supply /ton/ | 15 |
Conveyor Belt /m/ | 6'000 |
Euro Khan LLC proudly supply chemicals produced under the highest reliability, safety and environmental standards. One of many experience we have is, with our partner Veolia’s products, we have successfully supplied 1000tn Water Treatment Chemicals and Equipment to Oyu Tolgoi between 2016-2018.
Ongoing since | 2016 |
Saving on consumables /year/ | 97% |
Water Treatment Chemicals /ton/ | 1'000 |
ALTAI CITY WATER SUPPLY PROJECT “TAISHIR-ALTAI”
Background: The present water source for Altai city does not meet potable water standards and the ratio between calcium and magnesium is improper and has an adverse impact on human health. Water resources for the city are not sufficient to supply the current demand.
Previous underground water investigations have not found water sources with adequate resources that satisfy water quality standards. In order to solve all these issues, the project proposed to bring water to Altai city from the reservoir of the existing Taishir Hydro-power plant by means of a 45 to 50 km long pipeline
Present situation: Water demand for Altai city is 2000 m3/day or 23 liters per second. The city is presently being supplied with the water with only half this amount – 10 to 12 liters per second – and under strict time limitations. In Altai city, the price for 1-liter water is 1 tugrug per liter for the offices, 1.5 tugriks for water distribution points, and 3 tugriks for water that is distributed by the trucks. This tariff is 5 times higher than the water tariff in Ulaanbaatar City. In order words, Altai residents are paying a high price for poor quality water.
A 2010 design study, “Improvement and Rehabilitation of Water Supply System in Altai City” finance by the Asian Development Bank, estimated that daily water demand would be 2,376 m3/day or 27.5 l/sec in 2020 and 4,493 m3/day or 52 l/sec in 2040, based on Altai City future development trends, industrial and service sector trends. Therefore, it seems that 15.5 l/sec water in 2020 and 40 l/sec water in 2040 will be needed additionally.
Year of project implementation | 2020 |
Value | 15,000,000 $ |
Boiler capacity | 2x29 MWt |
Shipments | 380 |
Year of project implementation | 2019-2020 |
Value | 56,000,000 CNY |
EK provides engineering services along with professional consulting services that help clients solve their complex infrastructure and development challenges in mining, power, water, and other industries. We have proudly conducted Independent Technical Report to Erdenes Tavan Tolgoi Mine in 2019.
Year of project implementation | 2019 |
Our engineering and consulting services include scoping studies, feasibility studies, international standard resource estimation and technical reports, FEED, basic and detailed design, due diligence, and owners engineering services. Such study reports help customers make better decisions on the technical and economic aspects of an upcoming project. We have successfully managed consulting service of Power and Logistics study to Aspire Mining’s Ovoot Coking coal mine in 2018.
Year of project implementation | 2018 |
At Ovoot coking coal mine |
Year of project implementation | 2021 |
Value | 198,000 EUR |
We proudly supply the best quality bearings to top industrial companies in Mongolia. One example is, in 2021, we soundly supplied bearings to Erdenet Mining Corporation.
Year of project implementation | 2021 |
Value | 1,080,000,000 MNT |
In 2021, we have proudly handed over 3 sets of KPC1100 Gensets with KTA 38-G% Cummins engine to our client Khugjil Energy LLC.
Year of project implementation | 2021 |
Generator model | KPC1100 Genset |
Generator engine | KTA38-G5 Сummins engine |
Value | 1,404,212,040 MNT |
We have successfully supplied Hydrex 4104 chemical products to Power Plant 4 in 2021.
Year of project implementation | 2021 |
Value | 57,597,210.00 MNT |
With our team of mining sector professionals, we successfully completed Bankable Feasability Study to Zes Erdeniin Huvi in 2017.
Year of project implementation | 2017 |
At Erdenet Mine |
In 2020, we have completed consulting service of ore Sorting technology study to one of Mongolia’s biggest companies, Erdenet Mongolia Company.
Year of project implementation | 2020 |
Value | 121,496,837.00 MNT |